JIANG SONG ROBOT
中文 EN
Get a quote

Sizing and specification

What a survey must bring back

Material and carriers Types, unit weights, carrier type and size, ground clearance, pallet specification, overhang and offset centres of gravity, carrier material and colour.
Flow and takt Trips per day, when the peak falls, distance per trip, pick and drop locations, and any hard cycle constraint.
Site Aisle width at its narrowest, floor material and flatness, ramps and their gradient, gaps and steps, load capacity, grating or hollow raised floors, and the position and size of doors and lifts.
Environment Temperature and humidity, dust, lighting and direct sun, mirrors and glass walls, cleanroom or explosion-proof requirements.
Network Existing WiFi coverage and signal strength, seamless roaming, and whether a server position is available.
People and traffic Foot traffic in the work area, forklifts and hand trolleys sharing the aisles, and whether zoning is possible.
Interfaces Which equipment (conveyors, machines, lifts, doors) and which systems (WMS, MES, ERP) must be interfaced, and whether those interfaces will be opened.

Need the full engineering documents?

Site survey forms, model-specific spare-parts lists, CE certificates and battery transport documents are issued per project. Tell us the model and the site and we send the current version.

Request documents